[{"data":1,"prerenderedAt":345},["ShallowReactive",2],{"cms:en\u002Fsettings":3,"cms:collection:en\u002Fblog:3":51,"cms:collection:en\u002Fnews:3":86,"cms:en\u002Fpages\u002Fservices":117,"cms:collection:en\u002Fservices:50":163},{"_cms":4,"navigation":5,"headerCta":25,"footerNavigation":28,"legalLinks":38,"privacyLink":45,"socialLinks":46,"companyName":47,"tagline":48,"address":49,"phone":50},1,[6,10,13,16,19,22],{"kind":7,"slug":8,"label":9},"page","about","About us",{"kind":7,"slug":11,"label":12},"concept","AC vs DC",{"kind":7,"slug":14,"label":15},"products","Products",{"kind":7,"slug":17,"label":18},"services","Services",{"kind":7,"slug":20,"label":21},"partnerships","Partnership",{"kind":7,"slug":23,"label":24},"blog","Articles",{"kind":7,"slug":26,"label":27},"contact","Contact",[29,32,33,34,35,36,37],{"kind":7,"slug":30,"label":31},"","Home",{"kind":7,"slug":8,"label":9},{"kind":7,"slug":11,"label":12},{"kind":7,"slug":14,"label":15},{"kind":7,"slug":17,"label":18},{"kind":7,"slug":20,"label":21},{"kind":7,"slug":26,"label":27},[39,42],{"kind":7,"slug":40,"label":41},"legal\u002Fprivacy","Privacy policy",{"kind":7,"slug":43,"label":44},"legal\u002Fcookies","Cookie policy",{"kind":7,"slug":40,"label":30},[],"Innosys Delft","Specialists in AC and DC electrical networks. We share our knowledge for a sustainable future.","Delft\nNederland","+31 (0)15 000 0000",[52,67,76],{"category":53,"summary":54,"author":55,"image":56,"publishedAt":62,"key":63,"title":64,"description":65,"slug":63,"url":66},"dc-technology","A deep dive into the topology of a DC network: where conversion losses arise, how to remove them and what that means for a farm, a neighbourhood or a business park. With single-line diagrams and measurement graphs from our own test setup.","Rob Arkesteijn",{"src":57,"alt":58,"decorative":59,"width":60,"height":61},"https:\u002F\u002Fiklidzssjn8obkom.public.blob.vercel-storage.com\u002Fcms\u002Fmigration\u002Fimage-3937571f7cbb0cbb16c6995268ce4eb0c7fc3e30-1408x768-jpg.jpg","A DC distribution installation in a utility room: a wall-mounted busbar with thick orange DC cables",false,1408,768,"2026-06-28","dc-ringnet","Why a local grid can run better on direct current","The topology of a DC network: where conversion losses arise, how to remove them and what that means for a farm, a neighbourhood or a business park.","\u002Fen\u002Fblog\u002Fdc-ringnet",{"category":53,"summary":68,"author":55,"image":69,"publishedAt":72,"key":73,"title":74,"description":68,"slug":73,"url":75},"Every conversion between AC and DC costs energy. We follow the chain from panel to consumer and show where the efficiency leaks away.",{"src":70,"alt":71,"decorative":59,"width":60,"height":61},"https:\u002F\u002Fiklidzssjn8obkom.public.blob.vercel-storage.com\u002Fcms\u002Fmigration\u002Fimage-1eac07efe46cb356fc6a33ee43451e25f84a7e34-1408x768-jpg.jpg","Close-up of the aluminium heatsink fins of a power converter in an open grey enclosure","2026-06-20","conversieverliezen","Conversion losses: where they arise and how to remove them","\u002Fen\u002Fblog\u002Fconversieverliezen",{"category":77,"summary":78,"author":55,"image":79,"publishedAt":82,"key":83,"title":84,"description":78,"slug":83,"url":85},"networks","Star, ring or bus? How the shape of a local DC grid determines its reliability and measurability.",{"src":80,"alt":81,"decorative":59,"width":60,"height":61},"https:\u002F\u002Fiklidzssjn8obkom.public.blob.vercel-storage.com\u002Fcms\u002Fmigration\u002Fimage-de32a46513f9c7e6c86ee85325a566815f1dc698-1408x768-jpg.jpg","Overhead view of orange and black DC cables forming a closed loop across a metal cable tray","2026-06-11","dc-ringnetwerk-topologie","The topology of a DC ring network","\u002Fen\u002Fblog\u002Fdc-ringnetwerk-topologie",[87,97,107],{"category":88,"summary":89,"image":90,"publishedAt":93,"key":94,"title":95,"description":89,"slug":94,"url":96},"milestone","Our test setup connects solar, storage and a charging point fully on direct current — every connection point measurable.",{"src":91,"alt":92,"decorative":59,"width":60,"height":61},"https:\u002F\u002Fiklidzssjn8obkom.public.blob.vercel-storage.com\u002Fcms\u002Fmigration\u002Fimage-7a498f6f73967c3b8049aaa84bfeb7a5bd6a2970-1408x768-jpg.jpg","A test rig of a miniature DC home network on a board: a small solar panel, a battery module, a charge point and a DC converter","2026-07-02","miniatuur-dc-thuisnetwerk","First miniature DC home network live in Delft","\u002Fen\u002Fnews\u002Fminiatuur-dc-thuisnetwerk",{"category":98,"summary":99,"image":100,"publishedAt":103,"key":104,"title":105,"description":99,"slug":104,"url":106},"project","The DC network in Delft now serves two charging points alongside the home and storage.",{"src":101,"alt":102,"decorative":59,"width":60,"height":61},"https:\u002F\u002Fiklidzssjn8obkom.public.blob.vercel-storage.com\u002Fcms\u002Fmigration\u002Fimage-0f5a2707036151763c359ed976594a4f48882cf7-1408x768-jpg.jpg","Two grey charge points side by side on a paved forecourt","2026-06-18","tweede-laadpunt","Test setup expanded with a second charging point","\u002Fen\u002Fnews\u002Ftweede-laadpunt",{"category":108,"summary":109,"image":110,"publishedAt":113,"key":114,"title":115,"description":109,"slug":114,"url":116},"announcement","Together we accelerate knowledge sharing on direct-current infrastructure in the Netherlands.",{"src":111,"alt":112,"decorative":59,"width":60,"height":61},"https:\u002F\u002Fiklidzssjn8obkom.public.blob.vercel-storage.com\u002Fcms\u002Fmigration\u002Fimage-f3f5a29c52561649604a3f3b060e809ee7830427-1408x768-jpg.jpg","A meeting table after a technical working session, with printed single-line diagrams, notebooks and coffee cups","2026-06-03","dc-nl-kennisplatform","Innosys Delft joins knowledge platform DC-NL","\u002Fen\u002Fnews\u002Fdc-nl-kennisplatform",{"_cms":4,"title":118,"description":119,"slug":17,"blocks":120},"Services — Innosys Delft","Design, advice and realisation of direct-current grids — independent, jargon-free and measurable.",[121,127,148,153],{"id":122,"type":123,"_v":4,"eyebrow":18,"title":124,"subtitle":125,"slotEyebrow":126},"b_kzp9qh","pageHero","From design to a working direct-current grid.","We make energy flows transparent and controllable. Our services follow a single arc — design, advice and realisation — independent and jargon-free. No price list; we tell you what we do and are happy to think along. Measuring is knowing.","TRAJECTORY · DESIGN → ADVICE → DELIVERY",{"id":128,"type":129,"_v":4,"colorVariant":130,"eyebrow":131,"eyebrowMono":59,"heading":132,"intro":133,"orientation":134,"steps":135},"b_f0xgcs","processSteps","surface","How we work","Three steps, one arc.","Every project follows the same sequence: we design the DC ring, advise independently on the choices around it, and guide the construction to a measurable, controllable grid.","horizontal",[136,140,144],{"kicker":137,"title":138,"body":139},"NODE_01","Design","We design the DC ring: topology, sizing and protection, matched to your sources, storage and consumption.",{"kicker":141,"title":142,"body":143},"NODE_02","Advice","We advise independently on storage, conversion and coupling — which choices fit your grid, without product interest.",{"kicker":145,"title":146,"body":147},"NODE_03","Realisation","We guide the construction, measurement and optimisation to handover — measuring is knowing, down to every connection point.",{"id":149,"type":150,"_v":4,"eyebrow":151,"intro":152},"b_bec1af","serviceList","What we do","Three services that follow on from each other: first the design, then the measurements that underpin it, then the guidance until the grid runs on its own. You can take them separately.",{"id":154,"type":155,"_v":4,"colorVariant":156,"eyebrow":157,"heading":158,"description":159,"cta":160,"secondary":162},"b_xv7bqd","ctaBand","nav-dark","Let's talk","A question about your project?","From a first exploration to a transferable design — we are glad to look at it with you. Independent and jargon-free.",{"kind":7,"slug":26,"label":161},"Get in touch",null,[164,230,288],{"eyebrow":165,"icon":166,"order":4,"summary":139,"image":162,"included":167,"approach":184,"stats":202,"figure":218,"cta":222,"key":227,"title":228,"description":139,"slug":227,"url":229},"SERVICE 01 · NETWORK DESIGN","share",[168,171,173,175,177,179,181],{"text":169,"detail":30,"included":170},"Topology of the DC ring",true,{"text":172,"detail":30,"included":170},"Sizing of bus and cabling",{"text":174,"detail":30,"included":170},"Protection concept per node",{"text":176,"detail":30,"included":170},"Measurement plan — measurable per connection point",{"text":178,"detail":30,"included":170},"Independent, with no product interest",{"text":180,"detail":30,"included":170},"Transferable design dossier",{"text":182,"detail":183,"included":59},"Construction and installation","That is the phase we guide rather than execute.",{"eyebrow":185,"heading":186,"intro":187,"steps":188},"APPROACH · NETWORK DESIGN","This is how we design your ring.","Four steps from intake to a transferable design — each with a measurable result.",[189,192,195,198],{"kicker":137,"title":190,"body":191},"Intake","We map your sources, storage, consumption and goals — and what you already measure today.",{"kicker":141,"title":193,"body":194},"Topology","We draw the ring: which nodes, which coupling to the grid, and where we measure.",{"kicker":145,"title":196,"body":197},"Sizing","Voltage level, bus, cabling and protection — evidenced, and explained in plain language.",{"kicker":199,"title":200,"body":201},"NODE_04","Handover","A measurable design dossier, ready for advice, tendering and construction.",[203,208,213],{"value":204,"unit":30,"label":205,"sub":206,"tone":207,"ruled":170},"1","CONVERSION STEP SOURCE → BUS","against 2 with AC coupling","primary",{"value":209,"unit":210,"label":211,"sub":212,"tone":207,"ruled":170},"100","%","MEASURABLE PER NODE","telemetry comes with the architecture",{"value":214,"unit":30,"label":215,"sub":216,"tone":217,"ruled":170},"0","PRODUCT INTEREST","independent advice","accent",{"image":162,"placeholderLabel":219,"caption":220,"credit":47,"ratio":221},"Schematic · DC ring topology","Schematic of a DC ring: sources, storage and loads on one shared bus, with a measurement point per node and a single controlled coupling to the public grid.","16-9",{"eyebrow":223,"heading":224,"body":225,"ctaLabel":226},"Your grid, your question","Wondering what your ring would look like?","Tell us about your sources, storage and consumption — and we will sketch the set-up that fits. Independent, jargon-free, and measurable from the first line.","Get in touch about network design","netontwerp","Network design","\u002Fen\u002Fservices\u002Fnetontwerp",{"eyebrow":231,"icon":232,"order":233,"summary":234,"image":162,"included":235,"approach":248,"stats":265,"figure":277,"cta":280,"key":285,"title":286,"description":234,"slug":285,"url":287},"SERVICE 02 · MEASUREMENTS","search",2,"We measure currents and voltages on every node and make the energy balance transparent. Measuring is knowing — independently established.",[236,238,240,242,244,246],{"text":237,"detail":30,"included":170},"Measurement per connection point",{"text":239,"detail":30,"included":170},"Energy balance across the whole installation",{"text":241,"detail":30,"included":170},"Export\u002Fimport at the grid coupling",{"text":243,"detail":30,"included":170},"Loss analysis per converter",{"text":245,"detail":30,"included":170},"Measurement dossier with uncertainty margins",{"text":247,"detail":30,"included":170},"Independent — we do not supply installations",{"eyebrow":249,"heading":250,"intro":251,"steps":252},"APPROACH · MEASUREMENTS","From question to established figure.","Four steps. The question determines the measurement set-up, not the other way round.",[253,256,259,262],{"kicker":137,"title":254,"body":255},"Framing","What do you want to know, and which decision depends on it? That determines what we measure, and for how long.",{"kicker":141,"title":257,"body":258},"Set-up","We place the measurement points and fix the reference, so the series are comparable with each other.",{"kicker":145,"title":260,"body":261},"Measurement series","Long enough to contain season, weekly pattern and peak load — not one nice day.",{"kicker":199,"title":263,"body":264},"Reporting","Figures with margins, and the interpretation kept separate from the measurement, so you can check both.",[266,271,275],{"value":267,"unit":268,"label":269,"sub":270,"tone":207,"ruled":170},"4","weken","MINIMUM SERIES","to capture the weekly pattern",{"value":272,"unit":210,"label":273,"sub":274,"tone":207,"ruled":170},"±2","UNCERTAINTY MARGIN","recorded per series",{"value":214,"unit":30,"label":215,"sub":276,"tone":217,"ruled":170},"we supply no installations",{"image":162,"placeholderLabel":278,"caption":279,"credit":47,"ratio":221},"Measurement set-up · per connection point","Measurement set-up on the Delft test rig: current and voltage per connection point, plus export and import at the grid coupling.",{"eyebrow":281,"heading":282,"body":283,"ctaLabel":284},"Measuring is knowing","Want to know what your grid really does?","Tell us which decision you want to underpin — and we will work out together what needs measuring, and for how long.","Get in touch about measurements","metingen","Measurements","\u002Fen\u002Fservices\u002Fmetingen",{"eyebrow":289,"icon":290,"order":291,"summary":292,"image":162,"included":293,"approach":306,"stats":322,"figure":334,"cta":337,"key":342,"title":343,"description":292,"slug":342,"url":344},"SERVICE 03 · GUIDANCE","document",3,"We guide construction, commissioning and optimisation to handover — from the first switching to a stable, controllable grid.",[294,296,298,300,302,304],{"text":295,"detail":30,"included":170},"Supervision during construction",{"text":297,"detail":30,"included":170},"Commissioning and configuration",{"text":299,"detail":30,"included":170},"Control parameters based on measurements",{"text":301,"detail":30,"included":170},"Protection verified in practice",{"text":303,"detail":30,"included":170},"Aftercare over the first months of operation",{"text":305,"detail":30,"included":170},"Handover dossier",{"eyebrow":307,"heading":308,"intro":309,"steps":310},"APPROACH · GUIDANCE","From design to working grid.","Four steps, ending at the point where you no longer need us.",[311,314,317,320],{"kicker":137,"title":312,"body":313},"Construction","During the build we check that execution matches the design.",{"kicker":141,"title":315,"body":316},"Commissioning","Bus, converters and protection into service step by step, with a measurement at every step.",{"kicker":145,"title":318,"body":319},"Optimisation","Adjust the control parameters from what the grid actually does.",{"kicker":199,"title":200,"body":321},"Dossier, measurement series and points of attention — after that you continue on your own.",[323,328,331],{"value":324,"unit":325,"label":326,"sub":327,"tone":207,"ruled":170},"3","mnd","AFTERCARE AFTER HANDOVER","measurement series included",{"value":204,"unit":30,"label":329,"sub":330,"tone":207,"ruled":170},"POINT OF CONTACT","from construction to handover",{"value":214,"unit":30,"label":332,"sub":333,"tone":217,"ruled":170},"ONGOING CONTRACT","continuing independently is the goal",{"image":162,"placeholderLabel":335,"caption":336,"credit":47,"ratio":221},"Commissioning · bus control","Commissioning a DC bus: converters switched in step by step, with a measurement at every step.",{"eyebrow":338,"heading":339,"body":340,"ctaLabel":341},"From paper to practice","Is there a design waiting to be built?","We are glad to look along during construction and commissioning — including when the design is not ours.","Get in touch about guidance","begeleiding","Guidance","\u002Fen\u002Fservices\u002Fbegeleiding",1795001570709]