[{"data":1,"prerenderedAt":235},["ShallowReactive",2],{"cms:en\u002Fsettings":3,"cms:collection:en\u002Fblog:3":51,"cms:collection:en\u002Fnews:3":86,"cms:en\u002Fcollections\u002Fservices\u002Fbegeleiding":117},{"_cms":4,"navigation":5,"headerCta":25,"footerNavigation":28,"legalLinks":38,"privacyLink":45,"socialLinks":46,"companyName":47,"tagline":48,"address":49,"phone":50},1,[6,10,13,16,19,22],{"kind":7,"slug":8,"label":9},"page","about","About us",{"kind":7,"slug":11,"label":12},"concept","AC vs DC",{"kind":7,"slug":14,"label":15},"products","Products",{"kind":7,"slug":17,"label":18},"services","Services",{"kind":7,"slug":20,"label":21},"partnerships","Partnership",{"kind":7,"slug":23,"label":24},"blog","Articles",{"kind":7,"slug":26,"label":27},"contact","Contact",[29,32,33,34,35,36,37],{"kind":7,"slug":30,"label":31},"","Home",{"kind":7,"slug":8,"label":9},{"kind":7,"slug":11,"label":12},{"kind":7,"slug":14,"label":15},{"kind":7,"slug":17,"label":18},{"kind":7,"slug":20,"label":21},{"kind":7,"slug":26,"label":27},[39,42],{"kind":7,"slug":40,"label":41},"legal\u002Fprivacy","Privacy policy",{"kind":7,"slug":43,"label":44},"legal\u002Fcookies","Cookie policy",{"kind":7,"slug":40,"label":30},[],"Innosys Delft","Specialists in AC and DC electrical networks. We share our knowledge for a sustainable future.","Delft\nNederland","+31 (0)15 000 0000",[52,67,76],{"category":53,"summary":54,"author":55,"image":56,"publishedAt":62,"key":63,"title":64,"description":65,"slug":63,"url":66},"dc-technology","A deep dive into the topology of a DC network: where conversion losses arise, how to remove them and what that means for a farm, a neighbourhood or a business park. With single-line diagrams and measurement graphs from our own test setup.","Rob Arkesteijn",{"src":57,"alt":58,"decorative":59,"width":60,"height":61},"https:\u002F\u002Fiklidzssjn8obkom.public.blob.vercel-storage.com\u002Fcms\u002Fmigration\u002Fimage-3937571f7cbb0cbb16c6995268ce4eb0c7fc3e30-1408x768-jpg.jpg","A DC distribution installation in a utility room: a wall-mounted busbar with thick orange DC cables",false,1408,768,"2026-06-28","dc-ringnet","Why a local grid can run better on direct current","The topology of a DC network: where conversion losses arise, how to remove them and what that means for a farm, a neighbourhood or a business park.","\u002Fen\u002Fblog\u002Fdc-ringnet",{"category":53,"summary":68,"author":55,"image":69,"publishedAt":72,"key":73,"title":74,"description":68,"slug":73,"url":75},"Every conversion between AC and DC costs energy. We follow the chain from panel to consumer and show where the efficiency leaks away.",{"src":70,"alt":71,"decorative":59,"width":60,"height":61},"https:\u002F\u002Fiklidzssjn8obkom.public.blob.vercel-storage.com\u002Fcms\u002Fmigration\u002Fimage-1eac07efe46cb356fc6a33ee43451e25f84a7e34-1408x768-jpg.jpg","Close-up of the aluminium heatsink fins of a power converter in an open grey enclosure","2026-06-20","conversieverliezen","Conversion losses: where they arise and how to remove them","\u002Fen\u002Fblog\u002Fconversieverliezen",{"category":77,"summary":78,"author":55,"image":79,"publishedAt":82,"key":83,"title":84,"description":78,"slug":83,"url":85},"networks","Star, ring or bus? How the shape of a local DC grid determines its reliability and measurability.",{"src":80,"alt":81,"decorative":59,"width":60,"height":61},"https:\u002F\u002Fiklidzssjn8obkom.public.blob.vercel-storage.com\u002Fcms\u002Fmigration\u002Fimage-de32a46513f9c7e6c86ee85325a566815f1dc698-1408x768-jpg.jpg","Overhead view of orange and black DC cables forming a closed loop across a metal cable tray","2026-06-11","dc-ringnetwerk-topologie","The topology of a DC ring network","\u002Fen\u002Fblog\u002Fdc-ringnetwerk-topologie",[87,97,107],{"category":88,"summary":89,"image":90,"publishedAt":93,"key":94,"title":95,"description":89,"slug":94,"url":96},"milestone","Our test setup connects solar, storage and a charging point fully on direct current — every connection point measurable.",{"src":91,"alt":92,"decorative":59,"width":60,"height":61},"https:\u002F\u002Fiklidzssjn8obkom.public.blob.vercel-storage.com\u002Fcms\u002Fmigration\u002Fimage-7a498f6f73967c3b8049aaa84bfeb7a5bd6a2970-1408x768-jpg.jpg","A test rig of a miniature DC home network on a board: a small solar panel, a battery module, a charge point and a DC converter","2026-07-02","miniatuur-dc-thuisnetwerk","First miniature DC home network live in Delft","\u002Fen\u002Fnews\u002Fminiatuur-dc-thuisnetwerk",{"category":98,"summary":99,"image":100,"publishedAt":103,"key":104,"title":105,"description":99,"slug":104,"url":106},"project","The DC network in Delft now serves two charging points alongside the home and storage.",{"src":101,"alt":102,"decorative":59,"width":60,"height":61},"https:\u002F\u002Fiklidzssjn8obkom.public.blob.vercel-storage.com\u002Fcms\u002Fmigration\u002Fimage-0f5a2707036151763c359ed976594a4f48882cf7-1408x768-jpg.jpg","Two grey charge points side by side on a paved forecourt","2026-06-18","tweede-laadpunt","Test setup expanded with a second charging point","\u002Fen\u002Fnews\u002Ftweede-laadpunt",{"category":108,"summary":109,"image":110,"publishedAt":113,"key":114,"title":115,"description":109,"slug":114,"url":116},"announcement","Together we accelerate knowledge sharing on direct-current infrastructure in the Netherlands.",{"src":111,"alt":112,"decorative":59,"width":60,"height":61},"https:\u002F\u002Fiklidzssjn8obkom.public.blob.vercel-storage.com\u002Fcms\u002Fmigration\u002Fimage-f3f5a29c52561649604a3f3b060e809ee7830427-1408x768-jpg.jpg","A meeting table after a technical working session, with printed single-line diagrams, notebooks and coffee cups","2026-06-03","dc-nl-kennisplatform","Innosys Delft joins knowledge platform DC-NL","\u002Fen\u002Fnews\u002Fdc-nl-kennisplatform",{"_cms":4,"title":118,"description":119,"slug":120,"eyebrow":121,"icon":122,"order":123,"summary":119,"image":124,"included":125,"approach":139,"stats":160,"figure":176,"cta":180,"blocks":185},"Guidance","We guide construction, commissioning and optimisation to handover — from the first switching to a stable, controllable grid.","begeleiding","SERVICE 03 · GUIDANCE","document",3,null,[126,129,131,133,135,137],{"text":127,"detail":30,"included":128},"Supervision during construction",true,{"text":130,"detail":30,"included":128},"Commissioning and configuration",{"text":132,"detail":30,"included":128},"Control parameters based on measurements",{"text":134,"detail":30,"included":128},"Protection verified in practice",{"text":136,"detail":30,"included":128},"Aftercare over the first months of operation",{"text":138,"detail":30,"included":128},"Handover dossier",{"eyebrow":140,"heading":141,"intro":142,"steps":143},"APPROACH · GUIDANCE","From design to working grid.","Four steps, ending at the point where you no longer need us.",[144,148,152,156],{"kicker":145,"title":146,"body":147},"NODE_01","Construction","During the build we check that execution matches the design.",{"kicker":149,"title":150,"body":151},"NODE_02","Commissioning","Bus, converters and protection into service step by step, with a measurement at every step.",{"kicker":153,"title":154,"body":155},"NODE_03","Optimisation","Adjust the control parameters from what the grid actually does.",{"kicker":157,"title":158,"body":159},"NODE_04","Handover","Dossier, measurement series and points of attention — after that you continue on your own.",[161,167,171],{"value":162,"unit":163,"label":164,"sub":165,"tone":166,"ruled":128},"3","mnd","AFTERCARE AFTER HANDOVER","measurement series included","primary",{"value":168,"unit":30,"label":169,"sub":170,"tone":166,"ruled":128},"1","POINT OF CONTACT","from construction to handover",{"value":172,"unit":30,"label":173,"sub":174,"tone":175,"ruled":128},"0","ONGOING CONTRACT","continuing independently is the goal","accent",{"image":124,"placeholderLabel":177,"caption":178,"credit":47,"ratio":179},"Commissioning · bus control","Commissioning a DC bus: converters switched in step by step, with a measurement at every step.","16-9",{"eyebrow":181,"heading":182,"body":183,"ctaLabel":184},"From paper to practice","Is there a design waiting to be built?","We are glad to look along during construction and commissioning — including when the design is not ours.","Get in touch about guidance",[186],{"id":187,"type":188,"_v":4,"body":189},"b_cbz730","text",[190,195,201,205,216,220,224,228,231],{"type":191,"content":192},"paragraph",[193],{"text":194},"A design on paper is not a working grid. We guide the construction, the commissioning and the first months of operation — until the grid does what the design promises and you can steer it yourself.",{"type":196,"level":197,"content":198},"heading",2,[199],{"text":200},"Where it usually goes wrong",{"type":191,"content":202},[203],{"text":204},"Not in the big choices, but in the transitions: a converter configured differently from what the design assumes, a measurement point shifted during construction, a protection setting that is right on paper but intervenes too early in practice.",{"type":191,"content":206},[207,209,214],{"text":208},"With direct current that weighs more heavily than with alternating current, because ",{"text":210,"marks":211},"the complexity here sits in the protection and the bus control",[212],{"type":213},"bold",{"text":215}," — not in the topology. A DC grid is not simpler; it is differently complex.",{"type":196,"level":197,"content":217},[218],{"text":219},"What we do",{"type":191,"content":221},[222],{"text":223},"We are present during construction, check that what gets built matches the design, and set the control parameters from measurements rather than assumptions.",{"type":191,"content":225},[226],{"text":227},"After that we follow the grid for a number of months: how often protection intervenes, how the bus behaves under peak load, and where a converter runs outside its optimal range.",{"type":196,"level":197,"content":229},[230],{"text":158},{"type":191,"content":232},[233],{"text":234},"We close with a handover: the configured parameters, the measurement series from the first months and the points to keep an eye on. After that you can carry on without us — that is the goal.",1795002726194]