Guidance

We guide construction, commissioning and optimisation to handover — from the first switching to a stable, controllable grid.

SERVICE 03 · GUIDANCE

A design on paper is not a working grid. We guide the construction, the commissioning and the first months of operation — until the grid does what the design promises and you can steer it yourself.

Where it usually goes wrong

Not in the big choices, but in the transitions: a converter configured differently from what the design assumes, a measurement point shifted during construction, a protection setting that is right on paper but intervenes too early in practice.

With direct current that weighs more heavily than with alternating current, because the complexity here sits in the protection and the bus control — not in the topology. A DC grid is not simpler; it is differently complex.

What we do

We are present during construction, check that what gets built matches the design, and set the control parameters from measurements rather than assumptions.

After that we follow the grid for a number of months: how often protection intervenes, how the bus behaves under peak load, and where a converter runs outside its optimal range.

Handover

We close with a handover: the configured parameters, the measurement series from the first months and the points to keep an eye on. After that you can carry on without us — that is the goal.

What you get
  • Supervision during construction
  • Commissioning and configuration
  • Control parameters based on measurements
  • Protection verified in practice
  • Aftercare over the first months of operation
  • Handover dossier
APPROACH · GUIDANCE

From design to working grid.

Four steps, ending at the point where you no longer need us.

  1. NODE_01

    Construction

    During the build we check that execution matches the design.

  2. NODE_02

    Commissioning

    Bus, converters and protection into service step by step, with a measurement at every step.

  3. NODE_03

    Optimisation

    Adjust the control parameters from what the grid actually does.

  4. NODE_04

    Handover

    Dossier, measurement series and points of attention — after that you continue on your own.

In practice
AFTERCARE AFTER HANDOVER3mndmeasurement series included
POINT OF CONTACT1from construction to handover
ONGOING CONTRACT0continuing independently is the goal
Commissioning · bus control
Commissioning a DC bus: converters switched in step by step, with a measurement at every step. — Innosys Delft
From paper to practice

Is there a design waiting to be built?

We are glad to look along during construction and commissioning — including when the design is not ours.