Guidance
We guide construction, commissioning and optimisation to handover — from the first switching to a stable, controllable grid.
We guide construction, commissioning and optimisation to handover — from the first switching to a stable, controllable grid.
Four steps, ending at the point where you no longer need us.
During the build we check that execution matches the design.
Bus, converters and protection into service step by step, with a measurement at every step.
Adjust the control parameters from what the grid actually does.
Dossier, measurement series and points of attention — after that you continue on your own.
We are glad to look along during construction and commissioning — including when the design is not ours.